Development awarded the project of a section of access to Merida AVE.

Merida, Aug 31 .- The Ministry of Development has awarded the company the contract Apia XXI for the drafting of the proposed fourth installment of the Arroyo de la Jara-Albuera of 11.8 km, belonging to the access to the line Merida high-speed Madrid-Extremadura.

The budget of the adjudication, published today in the Official Gazette of the State, amounts to EUR 1,470,086.74, as reported by the, darkfall gold, Ministry of Development in a note sent to

This section runs through the towns of Merida and Esparragalejo, both in the province of Badajoz, and has an approximate length of 8.3 km of double track and single track 3.5.

As unique works include two pergolas that will allow the execution of the sheep jump for two, free mmorpg game, of the four branches of departure to Merida.

These four branches are conditioned by crossing the Rio Aljucn.

The location and geometry of the pergolas are subordinated to the path of the strands, which form part of the project start, and the structures on the river Aljucn, whose pre-dimensioning, which is also part of the contract,, tera gold, must ensure the future viability of the same.

In addition, the circuit includes the viaduct over the stream of Albuera and replacement of numerous roads and services in a suburban environment.

According to the Ministry, the stretch of railway integration in Merida has an approximate length of 25.8 km and is in study phase information.

In this section include the "bypass" of Merida,, yoville coins, which has an approximate length of 20.8 km and is composed of sections, San Rafael-Quart de la Jara, recently awarded, which has an approximate length of 9 km in via double that run entirely by the municipality of Merida, and the aforementioned fourth installment of the Jara-Arroyo of the Albuera.

Merida complete access to link the sections north and south, in the study phase information.